Units, line cards and modules from Cisco's Headend System Releases line. We buy them in bulk, working or not, and handle the logistics.
Submit Your Inventory| Part number | Cisco description | End of sale | Last date of support |
|---|---|---|---|
| 4009933 | Regional Cntrl System v1.0 | March 7, 2016 | March 31, 2019 |
| 4029592 | DNCS SR 4.3, New System Sale | March 6, 2013 | March 31, 2016 |
| 4030186 | DNCS SR 2.8, New System Sale | March 6, 2013 | March 31, 2016 |
| 4030191 | DNCS SR 3.8, New System Sale | March 6, 2013 | March 31, 2016 |
| 4030417 | Replicated Database 1.0 | March 7, 2016 | March 31, 2019 |
| 4031419 | DNCS SR 2.7/3.7/4.2 Servoce Pack 3 | March 7, 2016 | March 31, 2019 |
| 4036213 | ASSY,MDL,MVI1G MVP VIDEO INPUT | November 26, 2019 | November 30, 2022 |
| 4036215 | ASSY,MDL,MIO1G MVP INPUT OUTPUT | November 26, 2019 | November 30, 2022 |
| 4036216 | ASSY,MDL,MVP MULTI-AUDIO CODEC (MMA) | November 26, 2019 | November 30, 2022 |
| 4036246 | ASSY,SUB,D9036 CHASSIS | November 26, 2019 | November 30, 2022 |
| 4036249 | ASSY,MDL,MVI-8 MVP VIDEO INPUT | November 26, 2019 | November 30, 2022 |
| 4037949 | DTACS 1.2,New System Sale | March 7, 2016 | March 31, 2019 |
| 4040157 | SPVTG Consulting Services - Cavalry 5.0 Infrastructure NRE | March 7, 2016 | March 31, 2019 |
| 714257 | VPN Conn for QAMs,BIG | March 7, 2016 | March 31, 2019 |
| D9036-2AC-1RU | CHASSIS, 1RU, No PSU, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-MIO-MKI | MODULAR INPUT OUTPUT, MKI, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-MMA-MKI | MODULAR MULTI AUDIO, MKI, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-MVC-MK2 | MODULAR VIDEO CODEC, MK2, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-MVI-4-MKI | MODULAR VIDEO INPUT, 4 SDI, MKI, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-MVI-8-MKI | MODULAR VIDEO INPUT, 8 SDI, MKI, D9036 | November 26, 2019 | November 30, 2022 |
| D9036-PNL-AUD | BREAK OUT PANEL, D9036 AUDIO, 8RX BNC, 2TX BNC, DB9 METADATA | November 26, 2019 | November 30, 2022 |
| D9036-PNL-CHAS | BREAK OUT PANEL, D9036 CHASSIS, 13 GPI, 3 ALARM, DB9 CONSOLE | November 26, 2019 | November 30, 2022 |
| D9036-PNL-EM | BREAK OUT PANEL, ROSA EM 12 DIGITAL INPUT | November 26, 2019 | November 30, 2022 |
| D9036-PNL-MNT-4 | BREAK OUT FRAME, QUAD MOUNT | November 26, 2019 | November 30, 2022 |
| D9036-PWR-400W-AC | PSU, AC, D9036, 400W | November 26, 2019 | November 30, 2022 |
| D9190-1RU | CHASSIS, D9190, 1RU | November 26, 2019 | November 30, 2022 |
| D9190-PCA-K9 | MODULE, D9190, PCA card | November 26, 2019 | November 30, 2022 |
| DBDS-4039285 | Sun Server M3000 w/SPARC64 VII+ | February 15, 2016 | February 28, 2019 |
| DBDS-4042851 | SPVTG Upgrade SR 2.7/3.7/4.2 Service Pack 4 | November 26, 2019 | November 30, 2021 |
| DBDS-4042894 | SPVTG-SR 5.0 Upgrade from 2.7/3.7/4.2 per 1K Devices | March 7, 2016 | March 31, 2019 |
| DBDS-4042896 | SPVTG-SR 5.0 Upgrade from 2.8/3.8/4.3 per Site,Sm System | March 7, 2016 | March 31, 2019 |
| DBDS-4042897 | SPVTG-SR 5.0 Upg from 2.7/3.7/4.2 SP4 per Site,Sm System | March 7, 2016 | March 31, 2019 |
| DBDS-4042898 | SPVTG-SR 5.0 Upgrade for 3rd Prty Lab from 2.8/3.8/4.3 | March 7, 2016 | March 31, 2019 |
| DTACS-3-0-L-K9 | DTACS 3.0 New System Sale, MSO Lab | March 7, 2016 | March 31, 2019 |
| DTACS-3-0-P-K9 | DTACS 3.0 New System Sale, per Site | March 7, 2016 | March 31, 2019 |
| DTACS-3-0-U-K9 | DTACS 3.0 Upgrade from 1.2, per Site | March 7, 2016 | March 31, 2019 |
| ECS-1-0-SW-K9 | ECS 1.0 Media and Docs | March 7, 2016 | March 31, 2019 |
| LPNC-LICP-ADINS | Field/Factory Ad Insertion Tier Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-DAREP | Field/Factory Data Replication Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-DES-UPG | Field/Factory PNC DES CA Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-DPI | Field/Factory Simple Profile DPI Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-MMUX | Field/Factory MetroMux Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-OSD | Field/Factory OSD Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-SATDR | Satellite Disaster Recovery Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-SIM-UPG | Field/Factory PNC Simulcrypt CA UPG Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-SNMP | Field/Factory SNMP Option (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICP-TRCO | Field/Factory Transcoder Control Option. (For Prim PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-ADINS | Field/Factory Ad Insertion Tier Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-DAREP | Field/Factory Data Replication Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-DES-UPG | Field/Factory PNC DES CA Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-DPI | Field/Factory Simple Profile DPI Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-MMUX | Field/Factory MetroMux Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-OSD | Field/Factory OSD Option. (For backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-SATDR | Satellite Disaster Recovery Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-SIM-UPG | Field/Factory PNC Simulcrypt CA Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-SNMP | Field/Factory SNMP Option (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-LICS-TRCO | Field/Factory Transcoder Control Option. (For Backup PNC) | November 26, 2019 | November 30, 2022 |
| LPNC-UPG-V14X-K9 | PNC major version upgrade to 14 series | November 26, 2019 | November 30, 2022 |
| LPNC-UPG-V15X-K9 | PNC major version upgrade to 15 series on SUN Servers | November 26, 2019 | November 30, 2022 |
| LPNC-UPGS-V14X-K9 | PNC major version upgrade to 14 series (backup) | November 26, 2019 | November 30, 2022 |
| LPNC-UPGS-V15X-K9 | PNC major version upgrade to SUN Server 15 series (backup) | November 26, 2019 | November 30, 2022 |
| MOS-CDVR-BW | MOS Cloud DVR/TSTV Streaming Capacity (per Gbps) | February 8, 2020 | February 28, 2022 |
| MOS-LIVE-CHAN | MOS Multi-Format Live Streaming (per channel) | February 8, 2020 | February 28, 2022 |
| MOS-ORIGIN-BW | On-Demand-Encapsulation Origin Streaming Capacity (per Gbps) | February 8, 2020 | February 28, 2022 |
| PNC-PRIM-UPG | PNC Primary Suite Upgrades | November 26, 2019 | November 30, 2022 |
| PNC-STBY-UPG | PNC Standby Suite Upgrades | November 26, 2019 | November 30, 2022 |
| ROYALTY-CALIC-VS | ROYALTY LIC, BROADCOM SPVTG | November 26, 2019 | November 30, 2022 |
| ROYALTY-MPEGLA-VS | ROYALTY LIC, MPEG PATENT SPVTG | November 26, 2019 | November 30, 2022 |
| ROYALTY-SIRIUS-VS | ROYALTY LIC, SIRIUS SPVTG | November 26, 2019 | November 30, 2022 |
| VCS-CPU-E52620D | 2.40 GHz E5-2620 v3/85W 6C/15MB Cache/DDR4 1866MHz | November 26, 2019 | November 30, 2021 |
| VCS-HDD300GI2F105 | 300GB SAS 15K RPM SFF HDD/hot plug/drive sled mounted | November 26, 2019 | November 30, 2021 |
| VCS-MR-1X081RU-A | 8GB DDR4-2133-MHz RDIMM/PC4-17000/single rank/x4/1.2v | November 26, 2019 | November 30, 2021 |
| VCSC-MRAID12G | Cisco 12G SAS Modular Raid Controller | November 26, 2019 | November 30, 2021 |
| VCSC-PSU1-770W | 770W AC Hot-Plug Power Supply for 1U C-Series Rack Server | November 26, 2019 | November 30, 2021 |
Send it anyway. We buy old, obsolete and low/no-value networking equipment in bulk, stacked in gaylords or on pallets, with no testing or boxing. Send your list →
We use Google Analytics to see which pages people find useful. May we set analytics cookies? See our Privacy Policy.